BRIEF NOTE
The site location is situated at Urora Community. The project involves desiltation and evacuation of silted sands and material in all the retention ponds and underground culverts, drainages and manholes outlined in the contract documents. Installation of galvanize poles and chain link galvanize fence wire with reconstruction of demolish fences and introduction of access and entrance gates in different locations.
Project Details
Edo State Flood Erosion and Watershed Management Agency (FEWMA)
Flood and Erosion Control Intervention/Maintenance Works at Urora Pond 1,2,3 & Gapiona, Ikpoba Okha & Oredo L.G.A., Edo State.
In Progress
Direct Job Offer as Nominated Subcontractor.
Don’t Hesitate to Contact Us
Office Hours
Mon - Sat: 8.00am - 5.00pm






